Job Location : Warren,MI, USA
A forklift drops of a crate of parts to your assembly line, all less than 15 pounds. You will take the parts out of the crate and hang them on racks. The racks will move through a machine that puts zinc plating on them and when they come out of the o Shift, Restaurant, Assembly line, Staffing, Assembly