Job title:- Planner/Scheduler III-US Location:- Syracuse, NY USA 13202 Duration:- 06 Months Hybrid - 3 days in the office, Tues, Wed, Thurs 8 am-5 pm. Pay rate:- $70 - $80/hr on W2 without any benefitsDescription:
- Required to have a high school degree and experience in the power industry. Experience in developing work packages at a power plant or similar facility is required.
- Develops work packages and project schedules with input/ assistance of other project team members, updating project schedules on a regular basis, performing resource loading as required.
Description: Job Purpose
- The Project Controls Scheduler will develop and oversee the schedule management delivery of projects within Gas Complex Construction. Utilizing Primavera P6, the scheduler will develop, monitor, update, and apply project controls techniques to ensure scope, schedule, and budget adherence throughout the Network Development Process.
Key Accountabilities
- Accountable for building and developing project schedules across a portfolio. The schedules will be built using the agreed work breakdown structure to support Engineers, Construction Managers, and Project Managers.
- Progress each project every month to ensure all projects are monitored for project controls in line with the monthly reporting cycle, checking accuracy and consistency of data, as well as supporting the end of year reconciliation process.
- Accountable for using the schedule and forecast to review the project cost/schedule integration throughout the Network Development Process.
- Accountable for ensuring schedule data is accurate to allow Project Controls to report milestones, planned value and earned value data, % completed on projects and project commentaries.
- Provide technical input and project level analysis.
- Understand sound scheduling logic and the interface of milestones and links between activities, portfolio views, etc.
- Support the activities of other team members, providing input and analysis as required.
- Supervisory/Interpersonal- Experience Required
- Good communication and team management.
- The ability to support, communicate and effectively develop working relationships with staff at all levels.
- Ability to use computer-based planning tools and work scheduling systems.
- Sound knowledge and understanding of project scheduling.
Qualifications
- 2-8 years' experience in schedule management experience.
- Demonstrate a high level of personal initiative, integrity and ability to interact with company personnel, contractors and regulatory representatives
- Understanding of how individual projects interact with each other as a result of outage plans and project interdependencies.
- Must have intermediate knowledge or advance knowledge of Microsoft Word, Excel and PowerPoint skills.
- Demonstrated relevant experience in the use of Oracle Primavera Project Management (P6) for the purpose of developing, monitoring, and maintaining the EPC & Integrated Schedule and all required reporting.
- Demonstrated relevant experience in construction, planning, scheduling, expediting, and tracking the progress of the Work for contracts of a similar nature, size, and complexity.
- The Scheduler Candidate shall have a bachelor's degree in one of the following fields: Mechanical Engineering, Electrical Engineering, Civil Engineering, Building Engineering,
Bachelor of Architecture, or an equivalent of eight (8) years of verifiable work experience in a scheduling role.
- The candidate shall have demonstrated relevant experience preparing various types of Baseline Schedules, and Monthly Contract Schedules Updates for multi-disciplinary infrastructure, power, gas, oil, or transportation projects of similar scope and complexity to the Contract.
- The Scheduler Candidate shall have demonstrated a minimum of two (2) years of complex project experience.
- Valid driver's license required with a safe driving history that meets Client's Safe Driver policy.
- Areas of expertise should include but not limited to:
- Performed Schedule Delay Analysis throughout the life cycle of the Project.
- Utilizing Windows Schedule Delay Analysis Method
- Prepared project Change Order schedule delay estimates & analysis.
- Evaluated Extension of Time Requests (EOT)
- Provided written updates on schedule variances for inclusion in both Monthly and Quarterly Reports.
- Developed and Integrated Schedule Frag-Net for Change Orders into Project Schedule.
- Evaluated the impact of additional work order to the schedule.
- Provided written updates on critical paths for inclusion in both Monthly and Quarterly Reports.
- Reviewed and analyzed schedules developed by General Contractors.
- Reviewed contractor schedule logic, durations, and recovery plans.
- Conduct Construction Progress Verification for all work packages from various Construction Managers, Resident Engineers and Field Engineers via Site Walk-Throughs.
- Perform Schedule & Cost Variances Analysis.
- Critical Path Analysis.
- Prepared Monthly Schedule Analysis and Progress Reports For Assigned Projects.
- Understanding of Earned Value Management As Related To The Engineering & Construction Projects.
- The candidate shall function as part of the integrated Project team and actively contribute to planning, mitigation, and coordinated maintenance and upkeep of the Scheduled deliverables for the assigned Contracts.